Accessibility Options: A- A A+
High Contrast
Loading...
Please wait while we fetch your content
Loading page content Department of Hydropower Development Govt. of Arunachal Pradesh
Committed to sustainable energy development in Arunachal Pradesh through responsible hydropower project management.
Important Links
Our Portals
Contact Us
Department of Hydropower Development
Government of Arunachal Pradesh
Civil Secretariat, Itanagar - 791111
commrdhpd.arn@gmail.com
+91-8731931119 (PIO)
© 2026 DHPD, Arunachal Pradesh
Last updated: 07-03-2026
Designed in compliance with GIGW 3.0 & WCAG 2.1 Level AA
DPR Summaries Last updated: 7 March 2026 Basin Studies and DPR Summaries
Comprehensive basin studies conducted by the Ministry of Environment, Forest and Climate Change (MoEF&CC) identify hydropower development potential across Arunachal Pradesh's seven major river basins.
Basin Studies Overview
Basin Study Year Projects Identified Approved Projects Total Capacity Status Kameng April 2015 29 HEPs - 1,282.70 MW Completed Subansiri April 2016 29 HEPs - 11,282.70 MW Completed Subansiri (Dikrong) April 2018 27 HEPs - 1,116.5 MW Completed Siang March 2015 44 HEPs 29 18,293 MW Completed Dibang - Under assessment - Significant Ongoing Lohit - Operational projects - Significant Ongoing Tawang - Under assessment - Significant Ongoing
Detailed Basin Summaries
Kameng Basin
Basin Study : April 2015
Study Conducted By : Ministry of Environment, Forest and Climate Change
Projects Identified : 29 Hydroelectric Projects (HEPs)
Total Potential : 1,282.70 MW
Geographic Scope : Northwestern Arunachal Pradesh
Project Scale Distribution :
Large projects (> 100 MW): Multiple
Medium projects (25-100 MW): Several
Small projects (< 25 MW): Multiple
Development Status :
Several projects in feasibility stage
Tendering in progress for some projects
Environmental assessments underway
Land acquisition in process
Chief Engineer : Shri Moto Basar (9436011190)
Download Kameng Basin Study (PDF)
Subansiri Basin
Have questions about this page?
Study Conducted By : Ministry of Environment, Forest and Climate Change
Projects Identified : 29 Hydroelectric Projects (HEPs)
Total Potential : 11,282.70 MW
Geographic Scope : Central Arunachal Pradesh
Mix of large storage and run-of-river projects
Strategic basin for overall development
Multiple developer interests
Complex environmental considerations
Environmental assessments in progress
Feasibility studies ongoing
Community consultations
Project-specific committees
Chief Engineer : Shri T.U Taba (7005893359)
Subansiri (Dikrong) Basin Study Conducted By : Ministry of Environment, Forest and Climate Change
Projects Identified : 27 Hydroelectric Projects (HEPs)
Total Potential : 1,116.5 MW
Geographic Scope : Subansiri region (Dikrong tributary)
Separate assessment from main Subansiri Basin
Distinct hydrological characteristics
Lower capacity but high strategic value
Sensitive environmental zones
Feasibility studies in early stages
Environmental screening ongoing
Multi-stakeholder coordination
Long-term development pipeline
Chief Engineer : Shri T.U Taba (7005893359)
Siang Basin Study Conducted By : Ministry of Environment, Forest and Climate Change
Total Projects Identified : 44 Hydroelectric Projects (HEPs)
Approved for Development : 29 HEPs
Dropped/Deferred : 15 HEPs
Total Potential : 18,293 MW
Basin Significance : Largest single hydropower basin in Arunachal Pradesh
Largest Project : Siang Upper Stage-II (3,750 MW)
Multiple projects above 1,000 MW capacity
Range from 100 MW to 3,750 MW
Mix of storage and run-of-river
Siang Upper Stage-II: 3,750 MW
Major storage projects for water management
Flood moderation benefits
Multi-purpose development
Multiple projects in implementation
Environmental clearances progressing
Infrastructure development underway
Community engagement ongoing
Dibang Basin Basin Status : Assessment ongoing
Hydropower Potential : Significant untapped resources
Geographic Scope : Eastern Arunachal Pradesh
Development Stage : Preliminary investigation
Future Plans : Comprehensive basin study planned
Chief Engineer : Shri Along Ketan (9436059399)
Lohit Basin Basin Status : Operational projects present
Hydropower Potential : Significant
Geographic Scope : Southeastern Arunachal Pradesh
Development Stage : Projects under construction and operation
Ongoing Projects : Multiple projects in various stages
Chief Engineer : Shri Along Ketan (9436059399)
Tawang Basin Basin Status : Strategic basin under assessment
Hydropower Potential : Significant
Geographic Scope : Northern Arunachal Pradesh
Development Stage : Early-stage exploration
Future Plans : Development strategy being formulated
Chief Engineer : Shri Along Ketan (9436059399)
Key Findings from Basin Studies
Environmental Sensitivity Basin studies identified:
Biodiversity hotspots requiring protection
Sensitive ecological areas
Conservation zones
Wildlife corridors
Forest cover requirements
Social Considerations
Tribal populations in project areas
Customary land rights
Traditional livelihood patterns
Resettlement requirements
Community consultation needs
Technical Feasibility
Hydrological assessments
Geological surveys
Power generation potential
Design standards
Construction feasibility
Prioritization Framework Basin studies recommended project prioritization based on:
Environmental sensitivity
Social impact management capacity
Technical viability
Developer readiness
Strategic importance
Project Approval Process
Basin Study Recommendations Basin studies identify projects as:
Recommended for Development : Subject to clearances
Conditional Approval : With specific conditions
Dropped/Deferred : Due to environmental or social concerns
Post-Study Process
Project Notification : Approved projects formally notified
Concession Opening : Projects opened for bidding
Developer Selection : Through competitive process
Feasibility Stage : Detailed studies by developer
Environmental Clearance : MoEF&CC clearance obtained
Forest Clearance : Forest Department approval
Construction Start : After all clearances
Using Basin Study Information
For Developers
Project identification and evaluation
Capacity assessment
Environmental requirement understanding
Community engagement planning
Feasibility study foundation
For Communities
Information on potential projects
Impact understanding
Benefit identification
Participation opportunities
Rights and protections
For Government
Policy formulation
Strategic planning
Resource allocation
Monitoring framework
Performance assessment
Contact for Basin Study Information Chief Engineer (Basin-specific) :
Kameng: Shri Moto Basar (9436011190)
Subansiri: Shri T.U Taba (7005893359)
Siang: Shri Karom Perme (9436040184)
Dibang, Lohit, Tawang: Shri Along Ketan (9436059399)
Civil Secretariat, Itanagar - 791111