DPR Summaries
Basin Studies and DPR Summaries
Comprehensive basin studies conducted by the Ministry of Environment, Forest and Climate Change (MoEF&CC) identify hydropower development potential across Arunachal Pradesh's seven major river basins.
Basin Studies Overview
| Basin | Study Year | Projects Identified | Approved Projects | Total Capacity | Status |
|---|---|---|---|---|---|
| Kameng | April 2015 | 29 HEPs | - | 1,282.70 MW | Completed |
| Subansiri | April 2016 | 29 HEPs | - | 11,282.70 MW | Completed |
| Subansiri (Dikrong) | April 2018 | 27 HEPs | - | 1,116.5 MW | Completed |
| Siang | March 2015 | 44 HEPs | 29 | 18,293 MW | Completed |
| Dibang | - | Under assessment | - | Significant | Ongoing |
| Lohit | - | Operational projects | - | Significant | Ongoing |
| Tawang | - | Under assessment | - | Significant | Ongoing |
Detailed Basin Summaries
Kameng Basin
Basin Study: April 2015
Study Conducted By: Ministry of Environment, Forest and Climate Change
Projects Identified: 29 Hydroelectric Projects (HEPs)
Total Potential: 1,282.70 MW
Geographic Scope: Northwestern Arunachal Pradesh
Project Scale Distribution:
- Large projects (> 100 MW): Multiple
- Medium projects (25-100 MW): Several
- Small projects (< 25 MW): Multiple
Development Status:
- Several projects in feasibility stage
- Tendering in progress for some projects
- Environmental assessments underway
- Land acquisition in process
Chief Engineer: Shri Moto Basar (9436011190)
Download Kameng Basin Study (PDF)
Subansiri Basin
Basin Study: April 2016
Study Conducted By: Ministry of Environment, Forest and Climate Change
Projects Identified: 29 Hydroelectric Projects (HEPs)
Total Potential: 11,282.70 MW
Geographic Scope: Central Arunachal Pradesh
Project Characteristics:
- Mix of large storage and run-of-river projects
- Strategic basin for overall development
- Multiple developer interests
- Complex environmental considerations
Development Status:
- Environmental assessments in progress
- Feasibility studies ongoing
- Community consultations
- Project-specific committees
Chief Engineer: Shri T.U Taba (7005893359)
Download Subansiri Basin Study (PDF)
Subansiri (Dikrong) Basin
Basin Study: April 2018
Study Conducted By: Ministry of Environment, Forest and Climate Change
Projects Identified: 27 Hydroelectric Projects (HEPs)
Total Potential: 1,116.5 MW
Geographic Scope: Subansiri region (Dikrong tributary)
Basin Characteristics:
- Separate assessment from main Subansiri Basin
- Distinct hydrological characteristics
- Lower capacity but high strategic value
- Sensitive environmental zones
Development Status:
- Feasibility studies in early stages
- Environmental screening ongoing
- Multi-stakeholder coordination
- Long-term development pipeline
Chief Engineer: Shri T.U Taba (7005893359)
Download Subansiri Dikrong Basin Study (PDF)
Siang Basin
Basin Study: March 2015
Study Conducted By: Ministry of Environment, Forest and Climate Change
Total Projects Identified: 44 Hydroelectric Projects (HEPs)
Projects Status:
- Approved for Development: 29 HEPs
- Dropped/Deferred: 15 HEPs
Total Potential: 18,293 MW
Basin Significance: Largest single hydropower basin in Arunachal Pradesh
Project Scale:
- Largest Project: Siang Upper Stage-II (3,750 MW)
- Multiple projects above 1,000 MW capacity
- Range from 100 MW to 3,750 MW
- Mix of storage and run-of-river
Strategic Projects:
- Siang Upper Stage-II: 3,750 MW
- Major storage projects for water management
- Flood moderation benefits
- Multi-purpose development
Development Status:
- Multiple projects in implementation
- Environmental clearances progressing
- Infrastructure development underway
- Community engagement ongoing
Chief Engineer: Shri Karom Perme (9436040184) Email: hpdmonitoring-arn@nic.in
Download Siang Basin Study (PDF)
Dibang Basin
Basin Status: Assessment ongoing
Hydropower Potential: Significant untapped resources
Geographic Scope: Eastern Arunachal Pradesh
Development Stage: Preliminary investigation
Future Plans: Comprehensive basin study planned
Chief Engineer: Shri Along Ketan (9436059399)
Download Dibang Basin Study (PDF)
Lohit Basin
Basin Status: Operational projects present
Hydropower Potential: Significant
Geographic Scope: Southeastern Arunachal Pradesh
Development Stage: Projects under construction and operation
Ongoing Projects: Multiple projects in various stages
Chief Engineer: Shri Along Ketan (9436059399)
Download Lohit Basin Study (PDF)
Tawang Basin
Basin Status: Strategic basin under assessment
Hydropower Potential: Significant
Geographic Scope: Northern Arunachal Pradesh
Development Stage: Early-stage exploration
Future Plans: Development strategy being formulated
Chief Engineer: Shri Along Ketan (9436059399)
Download Tawang Basin Study (PDF)
Key Findings from Basin Studies
Environmental Sensitivity
Basin studies identified:
- Biodiversity hotspots requiring protection
- Sensitive ecological areas
- Conservation zones
- Wildlife corridors
- Forest cover requirements
Social Considerations
- Tribal populations in project areas
- Customary land rights
- Traditional livelihood patterns
- Resettlement requirements
- Community consultation needs
Technical Feasibility
- Hydrological assessments
- Geological surveys
- Power generation potential
- Design standards
- Construction feasibility
Prioritization Framework
Basin studies recommended project prioritization based on:
- Environmental sensitivity
- Social impact management capacity
- Technical viability
- Developer readiness
- Strategic importance
Project Approval Process
Basin Study Recommendations
Basin studies identify projects as:
- Recommended for Development: Subject to clearances
- Conditional Approval: With specific conditions
- Dropped/Deferred: Due to environmental or social concerns
Post-Study Process
- Project Notification: Approved projects formally notified
- Concession Opening: Projects opened for bidding
- Developer Selection: Through competitive process
- Feasibility Stage: Detailed studies by developer
- Environmental Clearance: MoEF&CC clearance obtained
- Forest Clearance: Forest Department approval
- Construction Start: After all clearances
Using Basin Study Information
For Developers
- Project identification and evaluation
- Capacity assessment
- Environmental requirement understanding
- Community engagement planning
- Feasibility study foundation
For Communities
- Information on potential projects
- Impact understanding
- Benefit identification
- Participation opportunities
- Rights and protections
For Government
- Policy formulation
- Strategic planning
- Resource allocation
- Monitoring framework
- Performance assessment
Contact for Basin Study Information
Chief Engineer (Basin-specific):
- Kameng: Shri Moto Basar (9436011190)
- Subansiri: Shri T.U Taba (7005893359)
- Siang: Shri Karom Perme (9436040184)
- Dibang, Lohit, Tawang: Shri Along Ketan (9436059399)
Commissioner, DHPD Email: commrdhpd.arn@gmail.com Phone: 8731931119 (PIO)
Civil Secretariat, Itanagar - 791111
Related Resources
Have questions about this page?